Formula and worked example
A 4 × 8 ft bed with 1 ft spacing and a 0.5 ft setback contains 32 centers. An 8 × 2 ft center path leaves 16 centers in the two 8 × 1 ft planting strips. The SVG and coordinate list show every counted center.
Finished volume = net area × depth. 20 m² × 0.05 m = 1 m³. With 10% extra order this is 1.1 m³; at a supplied 1,600 kg/m³ it weighs 1,760 kg. With 20% physical shrinkage instead: 1 ÷ 0.8 = 1.25 m³. Do not combine these assumptions unnoticed.
Metric tonne = 1,000 kg; US short ton = 907.18474 kg; imperial long ton = 1,016.0469088 kg. Bags round up; density is not a structural load approval. Read the gravel guide and layout guide.